PLANNING DE PRESENTATION DES PROJETS PERSONNELS / SCHEDULE OF PRESENTATION OF THE PERSONAL PROJECTS
OCTOBER 29th OCTOBRE :
9.30 to 11.00
Mr. Karen BADALYAN - ARMENIE
ROAD SAFETY IMPROVEMENT -
MANAGEMENT AND MONITORING
Contacts : MM. Lanet et Poirier (ISTED) & M. Mignard (Chargé du Bureau de la Sécurité et des Equipements)
La création d’un schéma de contrôle de sécurité routière applicable en Arménie
11.15 to 12.45
Mrs. Magdalena KESKA - POLOGNE
ISPA IN POLAND : PREPARATION FOR EXTENDED DECENTRALIZATION OF IMPLEMENTATION SYSTEM
Contacts : Mr Robin Sebille - responsable regional Europe de l`Est et Asie centrale in Ministere de l’transports et du Logement ( direction des Affaires economiques et internationales) ; Mr Francoise Henriot - Adjoint au Charge du bureau des operations autoroutieres in Ministere de l’transports et duLogement (Direction des Routes) ; Mr Jean-Claude Ebel - responsible for International Cooperation in DATAR
Proper ISPA projects management in the context of the "future"use of cohesion & structural funds
improvement and speed up the process of implementation ofEU Projects ;
supervision on preparation of Application forms
improvement of cooperation with EC Delegation in Poland
speed up tendering procedures
14.30 to 16.00
Mr. Ludvik ENGEL - REP TCHEQUE
MANAGEMENT QUALITYY OF RECONSTRUCTION MOTORWAYS CONCRETE PAVEMENT
Contacts :
Honore Goacolou - Direction des Technigues et de la Promotion - EUROVIA
Samir Soliman - Eurovia central laboratrory of Eurovia form in Dourdan
Mr Cochet - LREP ( Bourget) & Mr. Brusle - SETRA (Bagneux)
In first step of my presentation I want to tell something about French way of reconstruction. In second step I will choose one or two possibility of reconstruction, which I thing we are able to use in Czech Republic. And I will show the way how to reach a good level of quality. The system which I want to use we can call Money adjustment. If the quality is good, I will pay 100%. If less I Will pay less money, If the level quality is more than I set than I will pay more.
16.15 to 17.45
Mr. Zigmantas PERVENECKAS - LITUANIE
BITUMINOUS MATERIALS FOR HEAVY DUTY PAVEMENTS. SOLUTIONS FOR LITHUANIAN ROADS
Contacts : Mr. Caroff - SCETAUROUTE (2001- 2nd semester)
factors causing deformations in the pavement
description of the distress mechanisms
possible solutions to counteract distress
test methods used to evaluate characteristics
use of modified binders
use of Stone Mastic Asphalt
setting up of requirements and recommendations
18.00 to 19.30
M Abakar Koroty Mahamat - TCHAD
ETUDE DE FAISABILITE TECHNIQUE & ECONOMIQUE D’UNE LIAISON ROUTIERE AU TCHAD
cette présentation est programmée sous réserve de texte à parvenir / this presentation is scheduled depending of the text existing
OCTOBER 30th OCTOBRE :
9.30 to 11.00
Mr Zoltan Takacs - HONGRIE
AN ANALYSIS OF THE HIERARCHICAL STRUCTURE AND DEVELOPMENT OF THE EXPRESSWAY AND HIGHWAY NETWORK
Contacts :M. Jean-Marc Sangouard - SETRA, M. Lionel Patte - SETRA, M. Claude Becker - SETRA
Presenting an overview of the French system of making medium and long term developmental conceptions, plans
Getting knowledge of different layouts of the main road network (focus on the expressways, which are not motorways)
Using these informations and experiences in my work at home.
11.15 to 12.45
M Peeter Skepast - ESTONIE
’EXPERIENCE ON BRIDGE,
TUNNEL AND ROAD CONCESSIONS -
SELECTED CASES’
Contacts :
France
Alain Fayard, General Inspector, Special Adviser to the Director, French Road Directorate
Naïma Cobo, Adviser, Economic and European Affairs, French Road Directorate
Alain Poliakoff, Business Development Director, Egis Projects
Emmanuel Michaux, Business Development Manager, Egis Projects
Yves Lajeunesse, Executive Vice President, International Activities, Cofiroute
Erik Merkez, Project Engineer, Cofiroute
Lauriane Chappé, Manager of the A 86 West Information Center, Cofiroute
Pascal Lechanteur, Sous direction des autoroutes et des ouvrage concedes, French Road Directorate
Elsewhere
Estonian Embassy in Greece
Estonian Embassy in Canada
Estonian Embassy in Portugal
Estonian Embassy in UK
Finnish National Road Administration
Public Road Administration of Iceland
Icelandsbanki
Report contains description of the 5 concession cases in different
countries.
The projects are by nature fixed link type of projects, i.e. bridge or
tunnel, but also one alone standing motorway stretch which does not form a
wider network.
Main value of the report is the collected data for each concession case,
witch gives the overview and general picture of the project. In description
of concession cases, it has been attempted to hold similar structure bearing
in mind the possibility to compare the similar components in different
projects.
14.30 to 16.00
Ms Bouchra Bentaleb - MAROC
ELABORATION D’UN GUIDE METHODOLOGIQUE POUR L’EVALUATION DES AMENAGEMENTS DE SECURITE AU MAROC
Tuteurs : M Michel LABROUSSE SETRA - France & M Mohamed HIMMI DRCR - Maroc
Analyse statistique de l’accidentologie au Maroc
Programme des aménagements de sécurité au Maroc
Pourquoi l’évaluation des aménagements de sécurité ?
Présentation du guide et comment il se situe par rapport aux autres guides existants ou en cours d’élaboration
Evaluation à priori
Evaluations après mise en service :
*Evaluation immédiatement après la mise en service
*Evaluation 3 à 5 ans après la mise en service
Mode opératoire du guide :
*Processus d’élaboration des évaluations immédiatement après la mise en service
*Processus d’élaboration des évaluations 3 à 5 ans après la mise en service
Outils nécessaires pour la bonne exploitation du guide :
* Fiches types d’aménagements
* Fiches outils
Etude de cas concrets choisis dans le 6ème projet routier au Maroc relatif aux aménagements de sécurité routière
Conclusions
Actions de management à mettre en œuvre dans la politique sécurité routière de la Direction des Routes au Maroc
16.15 to 17.45
Ms Dorina Tiron - ROUMANIE
SYSTEME DE GESTION DU RESEAU ROUTIER
Tuteurs :M. Alain GHISOLI Directeur Etudes, Construction et Entretien des Routes - SETRA - FRANCE & M. Vasile BOBOC Professeur à la Faculté des ponts et Chaussées IASSY - ROUMANIE
Création d’une base de données complète permettant l’archivage, la mise à jour et la production des documents de restitution ;
L’évaluation pour optimiser les stratégies d’entretien à long terme, l’optimisation pourra concerner uniquement les coûts des travaux de construction d’entretien ou intégrer aussi le coût supporté par l’usager ;
- Programmation des travaux ; L’évaluation et suivi du niveau de service
OCTOBER 31th OCTOBRE :
10.00 am to 12.00 am : M Guy POIRIER (ISTED) - M Jean-Olivier LAVAL (ENPC-PFE) & CESROUTE GROUP 2001-2002
Bilan détaillé de la formation par rapport aux objectifs pédagogiques /Detailed assessment of the training regrading the pedagogical objectives
Résultats concrets obtenus / Concrete results achieved
Suites à donner / Action to be taken
Structuration du réseau CESROUTE / Structuring the CESROUTE network
12.15 pm to 12.30 pm : M Philippe LEGER, M DEMARRE, M SCHMITT & CESROUTE Steering Comitee
Cérémonie de remise des certificats / Awarding Certificates Ceremony
12.30 pm : coktail de clôture
TELECHARGER LES PHOTOS DE LA PRESENTATION
DOWNLOAD THE PICTURESOF THE PRESENTATION
TELECHARGER LES PHOTOS DE L’EVALUATION ET DE LA CEREMONIE DE CLOTURE
DOWNLOAD THE PICTURES OF THE ASSESSMENT MEETING AND OF THE CLOSING CEREMONY